Installation Day 3 and 4.

Follow-up to Installation Day One. I missed Day 2 — Saturday was Day 3, and today is Day 4. Photos from the unit below.

Day 3 — Saturday

Same China carpentry order as the recent remodel — after arrival and Day One. Saturday, so they could not do much. Short check-in.

The scaffold I already bought

Study high cubbies needed height. Another installer (not this team) had quoted $500 to rent scaffolding.

These installers asked me to rent one. I said I already bought one — on Taobao, still in a box. Here's the link — take it if you want the same one. Under $200. Or rent it from me. They used it. Silver mobile scaffold, red wheels — right there in front of the high study cubbies.

Study high light-wood cubbies with silver mobile scaffold on red wheels; white holey protective wrap still on floor and surfaces
Study high cubbies — my Taobao scaffold in use. Holey white surface is wrap still on, not pegboard.

That board is a pallet

Second shot by the door (smart lock in frame). Easy to misread the holes — it is not pegboard and not protective wrap on carpentry. It is a pallet. Wires coiled at the cutout.

Wooden pallet panel with a grid of holes beside a door with black smart lock; coiled wires at a cutout on the shelf below
By the door — a pallet, not pegboard or wrap.

Around the DB box

Carpentry framing the electrical distribution board. Drawer boxes in without fronts yet. Network point above. Mid-install — carcasses first.

Light-wood cabinetry around gray electrical DB board with yellow warning label; drawer boxes without fronts to the right
DB box framed in — drawer boxes in, fronts not on yet.

TV feature wall

The TV feature wall — Day One it was waiting on a light point for the LED driver. Carcasses going up now. Aluminum A-frame ladder with blue steps, floor protection still down. Saturday pace.

Aluminum A-frame ladder with blue steps in front of a light-wood TV feature wall carcass; white floor protective foam
TV feature wall — carcasses up, A-frame ladder out.

Day 4 — Monday

They are mostly on the kitchen. Entrance shoe cabinet and nearby storage have doors on — interior still empty, shoe rack not in yet. TV feature wall and study have not moved much.

Entrance shoe cabinet

Doors on the shoe cabinet and the storage next to it. From the outside it looks further along than Day One. Interior is still empty. Shoe rack not installed yet.

Floor-to-ceiling light entrance storage with perforated cabinet doors along a hallway; white floor protective foam still down
Entrance shoe cabinet — doors on, interior and shoe rack not done.

Kitchen

This is where they spent the day. Upper and base carcasses up. One box still sitting on the floor. Tools all over the base units. Some progress — not done.

Kitchen cabinet carcasses in an L-shape with upper boxes mounted, a spare carcass on the floor, and tools on the base units
Kitchen — carcasses going in; this is the focus today.

TV feature wall

Not much since Saturday. Carcasses still open. Ladder still out.

Light-wood TV feature wall carcass with open cubbies, aluminum step ladder, and white floor protective foam
TV feature wall — still carcass-only.

Study

Same story. Scaffold still in front of the high cubbies. Not the focus today.

Study high cubbies with silver mobile scaffold in front, wooden ladder, and white floor protective foam
Study — scaffold still out; not much since Saturday.

Full story hub is still the recent remodel.

Feel free to send over any questions.